Between the classified document I have found the US embassy 2007 year report. Very interesting sometimes...
S E C R E T SECTION 01 OF 04 MOSCOW 005154
EO 12958 DECL: 10/09/2017
TAGS PREL, ECON, MARR, MASS, PARM, PINR, PINS, RS
SUBJECT: ADDRESSING RUSSIAN ARMS SALES
REF: A. STATE 137954 B. MOSCOW 3207 C. MOSCOW 3139 D. MOSCOW 3023 E. MOSCOW 557 F. MOSCOW 402
Classified By: Ambassador William J. Burns. Reasons 1.4 (b) and (d).
Friday, December 3, 2010
'Trikand' is prepeared for launch
The third project 11356 ship 'Trikand' is prepared for launching in 'Yantar' plant (Kaliningrad-Konigsberg, Russia). The 'BrahMos' missiles launchers are already installed on she, reported the workers team newspaper. The next ship will seemingly be a frigate for the Black Sea Navy they said. It would be a smooth transition for 'russificated' 11356 project, initially developed particularly for Indian Navy. The Russian systems will be installed there instead of Indian and Western equipment.
And some history:
And some history:
Sunday, October 31, 2010
Monday, October 25, 2010
Brahmos will be installed on Scorpenes
The Indo-Russian 'Brahmos' supersonic missiles will be installed on Indian 'Scorpenes' submarines, the 'BrahMos' JV co-director Alexander Maxichev said recently on EuroNaval show in France. 'The missile is ready for launching from subsurface platforms' - he said. Maxichev explained, that the results of the Indian competition for additional number of submarines will be known soon, and 'we (BrahMos) push for installation on these missiles on them'. Indirectly his message confirms 'Scorpene' is the winner of the tender.
Maxichev also said that the first 'Brahmos' test on new 11356 frigates build for India is planned for early 2011. He pointed out that 'despite some delay in frigates building there is no any delay in Brahmos production'. The propulsion system of this missile is developed and maid in Russia while the guiding system and launcher are developed by Indian side.
Maxichev also said that the first 'Brahmos' test on new 11356 frigates build for India is planned for early 2011. He pointed out that 'despite some delay in frigates building there is no any delay in Brahmos production'. The propulsion system of this missile is developed and maid in Russia while the guiding system and launcher are developed by Indian side.
Tuesday, October 19, 2010
Monday, October 18, 2010
A new pr. 1135.6 ship for India, pics
These pictures are from the Kaliningrad 'Yantar' shipyard newspaper, including VLS installation pictures.
Sunday, October 17, 2010
Thursday, October 7, 2010
Nerpa will go to India soon
Despite previous reports about further delay in delivery the Akula-II class SSN to India, the Russian military-industrial source confirmed Nerpa is ready to go to India. After the last India-Russia intergovernmental commission session the RosoboronExport Director General Anatoly Isaykin said to Russian news agency ARMS-TASS, that Nerpa will be transferred to India this year. 'There is no delay in the tests' - he said. As was reported before, the Indian crew will come to Vladivostok, conduct testing in open sea and then the act of transfer must be signed. The submarine will go to India guided by its Indian crew.
Between other news, leaked after the Russia-India military-tech cooperation meeting, RosoboronExport chief hinted the further spending for the joint PAK FA\FGFA program will be calculated with regarding to the fact that the Russian side has already spent a lot of money for PAK FA project, i.e. may not be equal. 'In fact we already have the plane for our sevice (PAK FA), now the advanced export variant development is needed' - he said. He expects signing the final agreement till year end.
In addition, the new deal for Su-30MKI aircrafts supply to India is prepared and even can be signed this year, the RosoboronExport source said.
Between other news, leaked after the Russia-India military-tech cooperation meeting, RosoboronExport chief hinted the further spending for the joint PAK FA\FGFA program will be calculated with regarding to the fact that the Russian side has already spent a lot of money for PAK FA project, i.e. may not be equal. 'In fact we already have the plane for our sevice (PAK FA), now the advanced export variant development is needed' - he said. He expects signing the final agreement till year end.
In addition, the new deal for Su-30MKI aircrafts supply to India is prepared and even can be signed this year, the RosoboronExport source said.
Sunday, September 12, 2010
Saras-Duet saga is resolved for good
As the Russian Interfax-AVN news agency reported in Sept. 8 the light 14-passengers aircraft Saras will follow the modernization according to Myasishchev's specialists recommendations. 'Till today the part of the work was already done. Particularly the expertize of what already done by the Indian specialists was conducted. The package of propositions for modernization was formulated' - said the source in Russian military-industrial complex. 'The second stage of the work is planned to start in Oct. 2010 and finish during the year, although elongation of this schedule is not excluded' - he considers: 'It will be more specific work on finishing, including ground tests. Not much changes in design is expected, but the questions about the safeness and controllability are remained, i.e. the problems which were not resolved by Indians'.
Indo-Russian air forces exercises
It seems to me that despite all voices of ill wishers the prospects of cooperation between Russia and India are sound as usually and the joint military exercises are planned again. This time it will be the air forces exercises. 'The common exercises will certainly be hold during next years' - said Ru AF chief Alexander Zelin after his visit in India, RIAN new agency reported 10.09.11.
The proposal has already been submitted for consideration to the governments of the two states. The joint exercises, if approved, may take place in 2011 or 2012.
- First time Russian pilots will be able to compare their skill with the famous Indian aces. Till now it took years for Ru AF to recovery the level of training after 90th/early 00 fall in financing. It's the most logical cause why such exercises were not occurred till now.
The proposal has already been submitted for consideration to the governments of the two states. The joint exercises, if approved, may take place in 2011 or 2012.
- First time Russian pilots will be able to compare their skill with the famous Indian aces. Till now it took years for Ru AF to recovery the level of training after 90th/early 00 fall in financing. It's the most logical cause why such exercises were not occurred till now.
Indo-Russian JV for MRTA was signed
As Russian RIAN and ITAR-TASS news agencies reported, the Indo-Russian agreement for prospective medium transport aircraft development and building was signed in Moscow.
Under the deal, each party will pay $300.35 million to the JV's charter capital. Unfortunately the official English translation did not include some details, then worth to add some points.
Hindustan Aeronautics Ltd (HAL) and United Aircraft Building Company expected to sign a deal in March during Prime Minister Vladimir Putin's visit to New Delhi, but India failed to get the paperwork ready and the signing was delayed.
- HAL will have 50% of the shares, UAC - 25% and RosOboronExport - 25%.
Manufacturing facilities will be set up both in Russia and in India. A total of 205 planes are to be made, 30% of which may be exported to third countries.
- As the MRTA Russian aircraft design house 'Ilushin' chief Victor Livanov said at the briefing, the Russian AF plan to purchase 100 planes and India - 45. It will allow to gain the manufacturing without losses. If taking the into consideration the World civil market the prospective level of sells can gain 390 aircrafts. 'The niche of 20 t payload is the most essential on the market. MTA will become the An-12 successor' - he add: 'First time the countries will develop, sell, give service and utilization for a transport plan'. On the first step the common engineering center will be organized in Moscow, and the Indo-Russian team will start the sketch projecting. After that on the stage of work project the aircraft will be divided to compartments, each of which will be designed by different teams composed with UAC and HAL engineers.
Under the deal, each party will pay $300.35 million to the JV's charter capital. Unfortunately the official English translation did not include some details, then worth to add some points.
Hindustan Aeronautics Ltd (HAL) and United Aircraft Building Company expected to sign a deal in March during Prime Minister Vladimir Putin's visit to New Delhi, but India failed to get the paperwork ready and the signing was delayed.
- HAL will have 50% of the shares, UAC - 25% and RosOboronExport - 25%.
Manufacturing facilities will be set up both in Russia and in India. A total of 205 planes are to be made, 30% of which may be exported to third countries.
- As the MRTA Russian aircraft design house 'Ilushin' chief Victor Livanov said at the briefing, the Russian AF plan to purchase 100 planes and India - 45. It will allow to gain the manufacturing without losses. If taking the into consideration the World civil market the prospective level of sells can gain 390 aircrafts. 'The niche of 20 t payload is the most essential on the market. MTA will become the An-12 successor' - he add: 'First time the countries will develop, sell, give service and utilization for a transport plan'. On the first step the common engineering center will be organized in Moscow, and the Indo-Russian team will start the sketch projecting. After that on the stage of work project the aircraft will be divided to compartments, each of which will be designed by different teams composed with UAC and HAL engineers.
Tuesday, September 7, 2010
Shtil-1 for Indian Navy, fresh memoirs
...A serious test passed "Altair" when working on ships built for India with "Kashmir " AA system. Already in Soviet times, under a contract with India , our country started to supply anti-aircraft missile systems of medium-range "Shtil" to the ships of Indian Navy. The complexes were developed by "Altair". Delivery policy documents was carried out separately for different plants, but a prime contractor, responsible for the complex as a whole, was not pointed. In the early 90-ies our equipment was supplied and installed at the Indian ships. Testing began with failures. Missiles did not hit the targets. Who's to blame? Each vendor has starting to prove his innocence.
Then Rosvooruzheniye "addressed to Altair and required sending a team of specialists headed by chief designer Alexander Sergeyevich Yevstigneyev to deal on the spot. And here revealed the failures of Indian designers on placement of equipment, the choice of general ship radar and other interfaced with SAM "Kashmir " systems. Our shipbuilders were not up to par too. It was spoken about inability of our complex to provide the required characteristics.
Sunday, September 5, 2010
Formidable Liana
An effective naval target search and destroying in blue water is impossible without a global target acquisition and weapon guiding system. In soviet time this role was given to the epic MKRTs 'Legenda' system. It has included two arms: 1) weapon guiding satellites US-A, 2) ELINT satellites, US-P. The weapon guiding subsystem was composed from US-A radar equipped sattelites, developed by NPO Mashine-building (Reutov, Moscow region) and manufactured in San-Petersburg's 'Arsenal' facility.
The ELINT part including US-P satellites ('Tselina-2' in last 1980 and 1990th, GRAU index — 17F17, also US-PU (УС-ПУ), EORSAT) with passive radars and solar batteries has Ukrainian overall design (OKB 'Yuzhnoye') with Russian ELINT payload (TsNIRTI design house):
The ELINT part including US-P satellites ('Tselina-2' in last 1980 and 1990th, GRAU index — 17F17, also US-PU (УС-ПУ), EORSAT) with passive radars and solar batteries has Ukrainian overall design (OKB 'Yuzhnoye') with Russian ELINT payload (TsNIRTI design house):
Sunday, August 29, 2010
A new universal VLS for Club/BrahMos
This are pictures of new universal VLS for Club and BrahMos missiles based on frigates:
Source: paralay.com
- Russian designation 3R-14UKSK-Kh. The fire control system is including. Provided:
- supply in modular plug and play containers, 4 or 8 missiles in each container
- installation
- maintenance
- power supply system
- computing system
- networking system
- means of loading
Source: paralay.com
- Russian designation 3R-14UKSK-Kh. The fire control system is including. Provided:
- supply in modular plug and play containers, 4 or 8 missiles in each container
- installation
- maintenance
- power supply system
- computing system
- networking system
- means of loading
Saturday, August 28, 2010
Kirov saga: how it was started
Since returning 3 remained Kirov class cruisers to service was declared, it would be interesting to look how it was started. This is a Soviet Navy video (from early 80th) about first Kirov class cruiser capability, recently declassified.
Wednesday, August 25, 2010
Project 667 Lada from inside
The internal rooms of Russian last generation non-nuclear submarine was show first time in video, at July's end, 2010. This sub is competing to be a basis for the next after Scorpene Indian submarine 'Project-75(I)'.
Status of Brahmos program, update
Great news IMHO! The submarine version of 'Brahmos' will start testing soon from a semi-drown launch platform, said Mr. S. Pillai to ARMS-TASS on the 'Space-EXPO 2010'. Also he has confirmed at 2012 the testing of air-based version will start, and 2013 - is the planned year of MKI-based 'Brahmos' induction in IAF.
Indo-Baltic Spirit
Joint Indo-Russian naval exercises in Baltic Sea, June, 2009. Ru Navy Pr. 20380 'Steregushchy' Corvette is working together with IN F37 Fregat Beas against common enemy.
Subscribe to:
Posts (Atom)


The first ship of Russian pr. 22350 FFG was launched in October 29 in San-Petersburg



















